Skip to main content

422 daysto Peppol mandate.

Check
Manufacturing · ERPNext UAE

Last updated · 2026.04

ERPNext for Manufacturing in UAE

Stop production chaos. Bill of Materials, work orders, quality control, and cost tracking. Live in 12 weeks. From AED 9,999.

50+
UAE Implementations
95%+
On Time Delivery
4.9/5
Client Rating
0
Data Breaches
UAE Data ResidencyFTA VAT Compliant4 Week Go Live95%+ On Time Delivery
01 / Pain
Without ERP

Are You Struggling With:

If this sounds familiar, you are not alone.

01
— Without OSForBiz

BOM chaos

Bill of Materials in Excel. Version control nightmare. Wrong parts ordered.

02
— Without OSForBiz

Production planning blind

No visibility into capacity. Rush orders disrupt everything. Overtime costs explode.

03
— Without OSForBiz

Quality issues

Defects caught too late. Rework costs. Customer complaints. Reputation damage.

04
— Without OSForBiz

Cost tracking impossible

True production cost unknown. Pricing guesswork. Margins eroding.

05
— Without OSForBiz

Inventory mismatch

Raw materials vs finished goods never reconcile. Stockouts or overstocking.

02 / Modules
With OSForBiz

How OSForBiz Fixes It

One system. No chaos. Here is what changes.

01 · Module

+Bill of Materials

Multi level BOM. Version control. Substitute items. Cost rollup. Always accurate.

02 · Module

+Production planning

Work orders. Capacity planning. Scheduling. Subcontracting. Full visibility.

03 · Module

+Quality management

Inspection at receiving, in process, final. Non conformance tracking. CAPA.

04 · Module

+Cost tracking

Material, labor, overhead costs per job. Real time margin visibility.

05 · Module

+Inventory integration

Raw materials consumed → WIP → Finished goods. Auto stock movements.

03 / Workflow
Implementation journey

From Chaos to Clarity

A 6 phase methodology refined across 50+ UAE implementations since 2021 with a 95%+ on time delivery rate.

Phase 01

Discovery

1 to 2 weeks

Map processes, define requirements.

Phase 02

Setup

1 to 2 weeks

Configure ERPNext, user roles.

Phase 03

Migration

2 to 4 weeks

Import existing data.

Phase 04

Integrations

1 to 3 weeks

Connect external systems.

Phase 05

Training

1 to 2 weeks

Train your team.

Phase 06

Go Live

1 week

Launch with support.

04 / Return
Before / after

Manufacturer Saves AED 15,000/Month

See the real numbers.

Monthly cost comparison
Before

Rework + overtime + inventory errors

AED 20,000/month waste
After

Controlled production + quality

AED 5,000/month waste
Monthly savingsAED 15,000/month
06 / Tier
Recommended for Manufacturing

Pre Built Manufacturing Package

Ready to deploy. Configured for your industry. Go live faster.

Recommended for Manufacturing
Manufacturing Package

Professional (AED 9,999)

Setup: AED 9,999 | Monthly: AED 800
  • +Manufacturing module
  • +Bill of Materials
  • +Work Orders
  • +Quality Management
  • +Cost Tracking
  • +12 week implementation
  • +40 hours/month support
07 / FAQ
Before you ask

Manufacturing FAQs

Common questions answered.

Can ERPNext handle multi level BOM?

Yes. Unlimited BOM levels. Sub assemblies. Substitute items. Cost rollup.

Does it support job costing?

Yes. Material, labor, overhead per work order. Real time cost tracking.

What about quality control?

Inspection templates. Quality checks at any stage. Non conformance tracking.

Can it handle subcontracting?

Yes. Send materials to subcontractor. Track WIP. Receive finished goods.

How long to implement manufacturing?

Professional package: 12 weeks typical. Includes BOM setup and training.

Next step

When You are Ready, We are Here.

Book a 15 minute call. We will show you exactly how OSForBiz eliminates your manufacturing chaos. No pressure. No sales pitch. Just clarity.

Or call +971 50 166 2441 · Sunday to Thursday, 9 AM to 6 PM GST

§ CredentialsVerified · UAE · since 2021